Addition Progress Slow But Real

Well, for the past month there has been progress. All the windows and exterior doors are in place. The first round of electric wiring rough-in has been done. The roofers should be here (maybe this week) to put the metal roof on. Next up is the plumber.

AdditionFromLoft

From the loft, looking down on the east-facing bow window and the sliding glass door onto the lower veranda. The electric rough-in has been done. In the foreground you can one of the two required floor outlets by the future loft railing. In the distance you can see the wood blocks supporting the great room outlet boxes — we are putting most of the wall outlets near the floor in the extra-wide baseboard.

Comments are closed.