Addition Progress on the Inside

Over the holidays the roofers completed the metal roof, and the insulation sub did round one on the inside of the exterior walls: sprayed 1" closed-cell urethane foam followed by fiberglass batts. Then last week the general contractor crew came in and did some wallboard. They did what they could while still leaving space for the plumber, who has been delayed. Once the plumber is done with his rough-in, it can be inspected and then the wallboard can be completed and then the insulation as well. This week (once the ice melts) the siding sub will start putting up the HardiePlank siding.

AddnWallboardPano1

A panoramic view from the loft of the insulation and wallboard.